We open on 1 January 2027. Until then we are not accepting registrations or requests.
Datasheetas published in the maker's catalogueCross-referencesacross makers and AWS / EN ISO classesDeliverySpain and PortugalESPTEN
FERVEO
Basket
Gedik · Cast iron

ELNIKEL-NC — ENi-CI

covered electrode · stick electrode

Choose the size

  • Ø 2.5 × 300 mm
    ≈ 5 kg
  • Ø 3.2 × 300 mm
    ≈ 5 kg
  • Ø 4 × 400 mm
    ≈ 5 kg
To order · price and lead time in the quote

We reply within 1 working day.

Field of application

  • Non-conductive, basic-graphite-coated nickel stick electrode
  • Repair welding of problematic cast iron parts of irregular shapes
  • Joint welding of cast iron parts, and cast iron parts to steel parts
  • Pre-heating to 200 °C is recommended for thick-walled components
  • Welding in short runs, and peening are required
PositionsPA flat PB horizontal-vertical PF vertical-up
PolarityDC+

Classification and approvals

Classification

AWS classENi-CI
EN ISO classE C Ni-CI 1

Approvals

  • CE, SEPRO, TSE
According to the Gedik 2023 catalogue; validity is confirmed with the order

Composition and properties

Chemical composition of the weld metal

C0.50
Nimin. 96.0
Values in mass %.

Mechanical properties

Yield strength (Rp0.2)200 MPa
Tensile strength (Rm)250 MPa
Elongation (A5)3 %

Hardness

  • approx. 170 HB

How to weld

Treatment and preparation

Pre-heating200 °C, for thick-walled components

Welding parameters by diameter

ØLengthCurrent
2.5 mm300 mm70–100 A
3.2 mm300 mm90–110 A
4 mm400 mm110–130 A
FERVEO guidance
By problem
Cast iron
Alternatives in the catalogue
Same class
same EN ISO designation · same AWS designation
ProductClassRmAvailability
ELNIKELGedikE C Ni-CI 1250 MPaTo order · price and lead time in the quote
ELNIKEL - HDGedikENi-CI250 MPaTo order · price and lead time in the quote
FICAST NIKjellbergENi-CI> 400 MPaTo order · price and lead time in the quote
Ni - CASTGedikE C Ni-CI 1240–300 MPaTo order · price and lead time in the quote
Ni-CAST BFNCGedikE C Ni-CI 1335 MPaTo order · price and lead time in the quote